One interesting need for the Glen Canyon power station is providing "black start" capability for the Southwest power grid (Black start - Wikipedia). It takes a bit of power to run any kind of generating facility, and usually that is pulled from the grid if one generating facility is down. But if everything on the grid is down, they have to get things going from batteries for starter motors to diesel generators, working their way up to full operation again. A hydroelectric facility requires very little parasitic power to operate.
Yes, that is true, but there is a huge amount of battery back up power being installed now on the grid in any location they can put it. Much more is in the works and being planned. Almost every large wind or solar development now has some part of battery storage included or is being added retroactively.
The better we can get the different grids in the country interconnected the easier it is to import extra energy from other places when needed or if there are troubles.
The things that large generators (of all types) do help with is sheer inertia for smoothing out fluctuations in generation and demand. Hydropower is a huge asset and well worth improving. Many of the large dams that have spillways for releasing water could be upgraded to include more generation or even adding whole new power plants but it is very expensive to do. Currently wind and solar plus battery is much cheaper so that is the economics of it which will limit these sorts of future developments.