Dangling Dooley
Well-Known Member
Lol, I've had too many Dangling Dirty Dogs (Chili Cheese Dogs) in my days there. Probably subtracted a few years from my life.when you say first lift station tank....how many were there? Also how was the sewage treated?
To my understanding it goes something like this but I could be completely wrong because I never really asked:
Lift Station 1 is attached to the dock and has a holding tank which adds water and possibly some chemicals/microorganism to start to thin up the matter and start the chemical breakdown process. Every pump out station and marina toilet/faucet flows into it via pipes under the dock.
In between lift station 1 and 2 are ~10ft long sectioned lengths of bolted together, slightly flexible pipes. NPS would have to add/subtract sections depending on the water level and also adjust the cable tensioning before or after depending if the water was going up or down. The lower the lake elevation, the more suction power is required because the pipe became longer. I'm no plumber, but that makes sense right?
Lift Station 2 is 3/4 the way up the hill and is a strong pump that sucks the waste up from Lift Station 1. Lift 2 also might act as a stoppage point for when they are adjusting the marina cables, because otherwise they wouldn't be able to control sludge oozing coming out when they were adding/subtracting pipes.
Lift Station 3 is next to the helipad and sucks the sludge up from Lift Station 2 and pumps it 1/3 mile away into the Maroon Lagoon. There might be a 4th Lift Station that takes all the sludge from Lift Station 3 and from employee housing and pumps it to the Lagoon. Or the housing might have it's own lift station independent to push matter into the Lagoon
Once it reaches the Lagoon, a chemical/microorganism is added to start breaking down the waste. This is also responsible for the reddish color.
Last edited:

